Skip to Content

Autodesk Construction Solutions

Solutions for Design, Build, and Operations

Autodesk Construction Solutions connect design, construction, and operations teams across the entire project lifecycle. From early planning with Autodesk Forma through detailed design with AutoCAD and Revit, preconstruction, construction execution with Autodesk Build, document management in Forma Data Management, and seamless collaboration via Autodesk Forma Design Collaboration providing real-time visibility.


Design Consulting is an Autodesk Gold Partner and Service Provider, offering Autodesk Software with wide range of complimentary software, training courses and services for Autodesks Ecosystem.  


   Autodesk Solutions Industries

Autodesk Construction Cloud platform connecting design and construction teams across project lifecycle

Typical Challenges with Construction Projects

Construction projects face recurring challenges across planning, coordination, documentation and delivery.

  • Planning: Balancing scope, codes, constructability and changing site or client requirements without losing coordination.
  • Coordination: Keeping models, drawings and schedules current as the project changes, and making issues clear enough to guide decisions.
  • Visibility: Producing clear reviews and reports that stay aligned with the latest design and site information, not a separate outdated view.
  • Collaboration: Sharing one coordinated set of drawings, models and documents across trades, reviews and project stages.


Impacts and Flow-on Effects

When planning, coordination, documentation and field information live in separate places, one gap sets off the next. A late change or a constraint that never reaches the model leaves drawings, schedules and reviews out of step. Teams then decide from stale views, rework multiplies, and handoffs stall because no one is looking at the same coordinated set.

  • Design Drift: Intent, codes, constructability and changing requirements pull apart. Without a shared model, coordination slips and the plan is diluted by last-minute fixes.
  • Stale Information: Clash checks, quantities and schedules lag the current design. Results arrive too late or too unclear to guide choices, so teams either ignore them or rebuild the work from scratch.
  • Misleading Reviews: Presentations and reports become a separate, outdated view. Stakeholders react to information that no longer matches the drawings, and decisions are made on the wrong picture.
  • Broken Handoffs: Trades, reviews and stages work from different files. Clashes surface late, documentation is rebuilt, and the project loses time at every exchange.
  • Compounding Cost: Each disconnected step adds rework. What starts as a small mismatch becomes delayed approvals, inconsistent documentation and a project that is harder to build as intended.


Autodesk Features and Benefits for Construction

When construction teams use Autodesk software, precise drawings stay familiar for documentation, while model-based workflows tie schedules, coordination and project data to the same design intent, so teams can review options, check clashes and share a coherent project without rebuilding the story at each handoff.

  • Clearer documentation: coordinated drawings and models reduce rework between design and delivery.
  • Better decisions: coordination and project data stay linked to the current model.
  • Stronger visibility: shared review helps teams see the project, not just the files.
  • Smoother collaboration: design, preconstruction and construction tools work as one workflow rather than separate tasks.

For construction teams, that connection turns technical work into a consistent project record that is accurate enough for delivery and clear enough for the people building and operating the asset.

Autodesk Forma

Autodesk Forma supports early planning and design decisions with connected data, clearer coordination and real-time collaboration. Teams can explore options, keep models and documents aligned, and share one current view from planning through delivery.

Available in Australia with expert local support, it fits Autodesk Construction Solutions across design, preconstruction, construction and operations, so authorised users can collaborate from anywhere online.


Model Management Build Takeoff Explore Forma 

Autodesk Construction Software

Construction teams need connected tools for planning, coordination, documentation and delivery. These Autodesk applications cover that path, from precise drawings and model-based design to shared review and field execution. Autodesk offers a range of software solutions for small to large construction firms.


Building design in Autodesk AutoCAD LT with 2D floorplan and cross-sectional views in multiple viewports.

AutoCAD LT - 2D Design & Drawings

AutoCAD LT is built for precise 2D drafting and documentation. Create, edit, and annotate drawings in a familiar CAD workflow, with the tools architecture teams use to keep plans clear, consistent, and ready to share.

Buy AutoCAD LT

An AutoCAD LT design file on a desktop monitor

AutoCAD - 2D Design, Drawings & 3D Modelling

AutoCAD helps architecture teams create precise 2D drawings and 3D models in a familiar CAD workflow, from early concepts through clear documentation and presentation.

Buy AutoCAD

AutoCAD Architecture - Specialised Toolsets

AutoCAD Architecture, part of the AutoCAD specialised toolsets, includes purpose-built architecture tools such as walls, doors, windows, styles and schedules to a familiar CAD workflow. 

Buy AutoCAD

Revit LT

Revit LT supports 3D architectural design and documentation for smaller practices. Build a coordinated model, produce schedules and 2D drawings, and carry concepts through construction documents in a lighter BIM workflow.

Buy Revit LT

Autodesk AutoCAD Revit lt suite and Revit

AutoCAD Revit LT Suite

A Suite with AutoCAD LT and Revit LT for precise 2D drawings and model-based design, schedules and coordinated documentation. The suite helps architecture teams connect drafting with lighter BIM tools for everyday project work.

Buy AutoCAD Revit LT Suite

Revit 

Revit supports concept and detailed design in one coordinated model. Create schedules and 2D drawings, then run visualization, analysis, and generative design studies tied to that model so architecture teams can refine decisions from early concepts to documentation.

Buy Revit

Navisworks

Navisworks Manage brings model aggregation, clash detection and construction simulation into one review environment, so teams can coordinate disciplines, check issues early and move from design models to clearer project decisions.

Buy Navisworks 

AEC Collection

The AEC Collection brings together AutoCAD, Revit, and related Autodesk titles for architecture teams. It supports concepts, documentation, analysis, visualisation, and shared review, so design work can stay connected from early studies to coordinated drawings and presentation.

Buy AEC Collection

Autodesk Forma

Forma

Forma supports concept design, analysis, and collaboration for architecture teams. Early studies can stay connected through shared review, so design work moves from first ideas toward coordinated decisions and presentation.

Autodesk Forma

Compare Autodesk Construction Software & Technical Capabilities

Explore and compare Autodesk construction solutions across BIM modelling, CAD design, cloud collaboration, clash detection, reality capture, civil engineering, steel fabrication and visualisation. Identify the right software for your technical requirements, streamline workflows and improve project coordination from design through construction.

Autodesk Construction Software Feature Matrix


AEC Collection

AutoCAD LT

Forma Build

Forma Data Management

Forma Design Collaboration

BIM and 3D design

✓

—

Early design

—

—

2D CAD drafting

—

✓

—

—

—

Cloud collaboration

—

—

—

✓

—

Document management

—

—

✓

✓

✓

Design coordination

✓

—

✓

✓

✓

Version control

—

—

—

✓

✓

Revision Control

———✓✓

Performance insights

—

—

✓

—

—

Construction delivery

✓

—

—

✓

—

Autodesk Construction Software Technical Matrix

AutoCAD LT AEC Collection Forma Data Management Forma Design Collaboration Forma Build
2D CAD drafting application ✓ ✓ — — —
Full AutoCAD with specialised toolsets — ✓ — — —
Revit BIM authoring — ✓ — — —
Civil 3D authoring — ✓ — — —
Navisworks Manage desktop — ✓ — — —
Forma Data Management Essentials entitlement — ✓ ✓ ✓ ✓
Full Forma Data Management entitlement — ✓ ✓ ✓ ✓
Design Collaboration module — — — ✓ —
Model Coordination module — — — ✓ —
Forma Build module — — — — ✓
Native DWG drafting and editing ✓ ✓ — — —
Layers, blocks, Xrefs and layouts ✓ ✓ — — —
AutoLISP automation ✓ ✓ — — —
3D solid and surface modelling — ✓ — — —
Architectural BIM model authoring — ✓ — — —
MEP and structural BIM modelling — ✓ — — —
Civil corridor and surface modelling — ✓ — — —
Native Revit family authoring — ✓ — — —
Desktop drawing/model publishing ✓ ✓ — — —
Cloud project folder hierarchy — ✓ ✓ ✓ ✓
Role- and folder-based permissions — ✓ ✓ ✓ ✓
Automatic cloud file versioning — ✓ ✓ ✓ ✓
Previous version access and restore — ✓ ✓ ✓ ✓
Browser-based DWG viewing — ✓ ✓ ✓ ✓
Browser-based 3D model viewing — ✓ ✓ ✓ ✓
Cloud drawing and model markups — ✓ ✓ ✓ ✓
Cloud issue creation and assignment — ✓ ✓ ✓ ✓
Project activity tracking — ✓ ✓ ✓ ✓
Desktop Connector file synchronisation — ✓ ✓ ✓ ✓
File reference support via Desktop Connector — ✓ ✓ ✓ ✓
Automated drawing extraction — ✓ ✓ ✓ ✓
Bridge cross-project data sharing — ✓ ✓ ✓ ✓
Content Catalog — ✓ ✓ ✓ ✓
Forma Board — ✓ ✓ ✓ ✓
Custom document metadata — ✓ ✓ ✓ ✓
Document naming standards — ✓ ✓ ✓ ✓
Formal review and approval workflows — ✓ ✓ ✓ ✓
Document transmittals — ✓ ✓ ✓ ✓
Controlled document packages — ✓ ✓ ✓ ✓
Specification management — ✓ ✓ ✓ ✓
Advanced file search and sharing — ✓ ✓ ✓ ✓
Project reports — ✓ ✓ ✓ ✓
Insights dashboards — ✓ ✓ ✓ ✓
Forma Data Management API access — ✓ ✓ ✓ ✓
Cloud document workflow automation — ✓ ✓ ✓ ✓
Mobile cloud document access — ✓ ✓ ✓ ✓
Discipline-specific team spaces — — — ✓ —
Design package creation and sharing — — — ✓ —
Package consumption and comparison — — — ✓ —
Multidisciplinary model aggregation — ◐ — ✓ —
Automated cloud model coordination — — — ✓ —
Cloud clash detection — — — ✓ —
Coordination issue assignment — ◐ ◐ ✓ ◐
Revit Cloud Worksharing entitlement — — — ✓ —
Collaboration for Civil 3D entitlement — — — ✓ —
Collaboration for Plant 3D entitlement — — — ✓ —
Navisworks clash detection on desktop — ✓ — — —
Construction RFIs — — — — ✓
Submittal registers and workflows — — — — ✓
Construction meeting management — — — — ✓
Field forms and checklists — — — — ✓
Quality inspection workflows — — — — ✓
Safety observations and incidents — — — — ✓
Punch lists and defect management — — — — ✓
Field photo documentation — — — — ✓
Construction sheet management — ◐ ◐ ◐ ✓
Project schedule tracking — — — — ✓
Construction project closeout — — — — ✓
Mobile field execution workflows — — — — ✓
Construction budget management — — — — ✓
Cost contracts and commitments — — — — ✓
Change order management — — — — ✓
Cost forecasting — — — — ✓
Payment application workflows — — — — ✓
Cost-related project reporting — — — — ✓


AutoCAD LT

The matrix shows native AutoCAD LT capabilities, not the full AutoCAD product. It is a 2D drafting tool, not a full BIM authoring, model coordination or construction management platform.

Buy AutoCAD LT

AutoCAD LT Vs AEC Collection

AutoCAD LT is limited to 2D drafting, without 3D modelling, customisation APIs or model coordination. The AEC Collection supports discipline models, clash review and shared design data beyond 2D CAD.

Buy AEC Collection

AEC Collection vs Forma Design Collaboration

The AEC Collection includes Revit, Civil 3D and Navisworks Manage, but full cloud design collaboration, Revit Cloud Worksharing and cloud model coordination require the appropriate separate entitlement.

Forma Data Management Essentials vs Forma Data Management (Full Version)

Essentials includes core files, permissions, version control, viewing, markups and issues. Full Data Management adds document approvals, transmittals, naming standards, metadata, advanced workflows, Insights and API access.

Buy Forma Data Management

Forma Design Collaboration

This extends cloud data management with multidisciplinary design package workflows, model coordination and supported cloud co-authoring services. It does not supply the Revit or Civil 3D desktop authoring licences.

Buy Forma Design Collaboration

Forma Build 

This extends cloud data management into construction RFIs, submittals, quality, safety, field management, cost management and closeout. It is not a substitute for desktop CAD/BIM authoring or a Design Collaboration licence.

Buy Forma Build 

Explore the All Forma Modules

Complimentary Software and Services for Autodesk Software

Design Consulting offers a complete ecosystem of complementary software, training, and professional services designed to extend the power of Autodesk solutions. Alongside our training courses for tools like Revit, AutoCAD, Inventor, and Vault, we deliver expert services for design automation, CAD/BIM setup, template development, and Vault deployments and migrations. We supply software tools to enhance Autodesk workflows through intelligent automation, batch variant rendering, and real-time visualisation systems. We also develop web-based configurators and custom plug-ins that streamline product design, quoting, and sales processes. From parametric modeling to programming services, Design Consulting helps engineering and design teams unlock efficiency, consistency, and scalability across their entire digital design environment.

With this ecosystem of software and services, Design Consulting provides End to End Solutions that connect data, models, applications, systems, employees, departments, customers and suppliers, enabling seamless collaboration, streamlined workflows, and accelerated decision-making across the entire product and project lifecycle. By integrating design, automation, and digital delivery, your business becomes more efficient, reduces manual effort, saves time, and ultimately increases profitability.


Services Software Training Cloud End to End Solutions

Why Choose Design Consulting | Autodesk Gold Partner | Autodesk Service Provider

Design Consulting is a trusted Autodesk Gold Partner and Autodesk Service Provider. Design Consulting empowers architects, engineers, manufacturers, and builders with smart software, systems, automation, and digital tools that provide Autodesk end-to-end solutions that are connected with systems and machines. As an Autodesk Gold Partner, we deliver tailored solutions that simplify workflows, reduce costs, and drive better project outcomes.

About DC  Autodesk Courses Services Configurators CRM/ERP Batch Imagery

Find the Right Autodesk Construction Solution

Streamline design, BIM and construction workflows with Design Consulting. Our Autodesk specialists help you select and optimise software to improve productivity and reduce risk.

Fill out the contact form below or contact us on 1800 490 514, info@designconsulting.com.au or by live chat